TrackMe - My Realtime Location

TrackMe - My Realtime Location

0.0 14.17MB 0 免费
版本 1.0 更新 2025-12-15 开发者 Guanrao Chen
  • TrackMe - My Realtime Location screenshot
  • TrackMe - My Realtime Location screenshot
  • TrackMe - My Realtime Location screenshot
  • TrackMe - My Realtime Location screenshot
  • TrackMe - My Realtime Location screenshot
  • TrackMe - My Realtime Location screenshot
TrackMe - My Realtime Location screenshot
TrackMe - My Realtime Location screenshot
TrackMe - My Realtime Location screenshot
TrackMe - My Realtime Location screenshot
TrackMe - My Realtime Location screenshot
TrackMe - My Realtime Location screenshot

Description

Going to a party and want to let the host know where you are on the way

Going to a party and want to let the host know where you are on the way?

Delivering pizza and want to reassure the customer by showing exactly which street you're on?

Meeting friends and want them to see where you're stuck in traffic?

With TrackMe, sharing your real-time location has never been easier!

Just a couple of taps, and the host, customer, or friend can instantly and continuously see where you are and how long it may take until you arrive.

Unlike other location-sharing apps (such as Google Maps), TrackMe is extremely privacy-focused:

- No registration or login required

- No personal data collected

- The other party does not need the app — any browser works

- “Burn after share” — delete the share when your trip ends, or simply close the app; no history is stored

TrackMe doesn’t have fancy UI or unnecessary features. Its sole purpose is simple:
show WHERE you are right NOW — and that’s what we need most of the time.

Try it — you’ll love how simple and flexible it is.

How you use TrackMe is only limited by your imagination and creativity!
分类: 工具(185746) 版本: 1.0 BundleId: com.myfav5.trackme 开发者: Guanrao Chen 最近更新: 2025-12-15

应用内购买

1 个项目 1 种货币 CNY
1 中国

项目

¥ 0 CNY
;